Gantt Chart Maker

Enter one task per line with its start date and duration. Add an earlier task number to show a dependency.

Runs in your browser. No upload.

Your project data stays in this browser. Nothing is uploaded.

One task per line: task name | start date (YYYY-MM-DD) | duration in days | earlier task number (optional).

Your project timeline will appear here.

About this tool

Gantt Chart Maker made simple.

The chart is generated in your browser. Dates and dependencies are checked, but the plan does not account for holidays, team capacity or automatic resource leveling. Review the schedule before relying on it.

Guide

Using Gantt Chart Maker

The Gantt Chart Maker turns a list of tasks into a simple project timeline. Type one task per line with a name, a start date and a length in days, and add the number of an earlier task if one must finish first. Bars are drawn on a shared date scale in your browser, with CSV export and a print view. It does not schedule anything for you.

How to use it

  1. Type one task per line as name | start date | days | earlier task number, for example Design | 2026-11-05 | 4 | 1. The last part is optional, and dates use the YYYY-MM-DD form.
  2. Press Create Gantt chart, or Insert example to load a four-task sample that starts today. If a message appears, fix that line and press the button again.
  3. Use Save plan on this device to keep the text in your browser, Download CSV for a spreadsheet file, or Print chart to open a print preview.

Worked examples

A four-step plan that runs in a chain

You enter
Lines
Research | 2026-11-02 | 3; Design | 2026-11-05 | 4 | 1; Build | 2026-11-09 | 10 | 2; Launch | 2026-11-19 | 1 | 3
You get
Project span days
18
First day
2026-11-02
Last day
2026-11-19
Design bar
Starts at: 16.67%; Width: 22.22%

Each end date is the start plus the length minus one day, so Research covers 2 to 4 November. The whole chart is 18 days wide, and Design begins 3 days in, which is 3 / 18 = 16.67% of the width.

Run through the tool’s own code.

A dependency that starts too early

You enter
Lines
A | 2026-11-02 | 5; B | 2026-11-04 | 2 | 1
You get
Message
A dependent task cannot start before its earlier task finishes.

Task A runs from 2 to 6 November, but task B says it depends on A and starts on the 4th. No chart is drawn until B starts on 7 November or later.

Run through the tool’s own code.

What one CSV row looks like

You enter
Line
Design | 2026-11-05 | 4 | 1
You get
Header
Task,Start,Duration (days),Finish,Depends on
Row
"Design","2026-11-05","4","2026-11-08","1"

Every value is wrapped in quotation marks, the finish date is worked out for you, and the last column holds the line number of the earlier task. Rows are separated by a carriage return and a new line.

Run through the tool’s own code.

When it helps

  • Sketch the stages of a school, work or club project and see at a glance where they overlap.
  • Lay out a small renovation or an event-preparation schedule and print it for a wall.
  • Export the dates to a spreadsheet so a team can add owners, notes or costs.

Limits to keep in mind

  • You can enter up to 120 tasks. Names may be up to 100 characters, a duration is a whole number from 1 to 365 days, and the whole plan must fit inside 1,095 calendar days.
  • A task can depend on one earlier line only, and it must start the day after that task ends or later. Nothing moves by itself when you edit a date, and the vertical bar cannot appear inside a name.
  • Days are plain calendar days. Weekends, holidays, team capacity and resource clashes are not considered, so check the plan yourself before relying on it. Only one plan is saved, in this browser only.

Tips

  • Write the lines in the order you want them on the chart, because a dependency number is the line position counted from 1.
  • Count the start day as day one: a 3-day task that starts on the 2nd ends on the 4th.
  • Open the CSV in a spreadsheet to add columns, but be careful with a name that starts with an equals sign, since a spreadsheet may read it as a formula.

Common questions

About Gantt Chart Maker.

What does the last number on each line mean?

It is the position of an earlier line, counting from 1, that must finish before this task starts. Leave it out when the task does not wait for anything. It must point upward, never to the same line or a later one.

How is the end date calculated?

The end date is the start date plus the duration minus one day, so both the first and last day count as working days of the task. A one-day task starts and ends on the same date.

Can two tasks run on the same days?

Yes. Tasks without a dependency may overlap freely and are drawn as separate bars on their own rows. Only a task with an earlier-task number is checked against that earlier task.

Does it skip weekends or holidays?

No. Every day on the calendar counts the same. If your team does not work at weekends, lengthen the duration yourself so the end date lands where you expect.

Where is my saved plan kept?

In your browser's local storage on this device, under one saved slot. Nothing is uploaded, and Delete saved plan removes it. Clearing site data or switching browsers also removes it.

Why does a name with a vertical bar fail?

The bar separates the fields on each line, so a name containing one pushes the dates out of place and the line is rejected with a date message. Use a dash or a slash in the name instead.

How do I use Gantt chart?

Enter one task per line with its start date and duration. Add an earlier task number to show a dependency.

Is my data uploaded to a server?

No. This tool runs locally in your browser. Your input is not uploaded.